Share

Bradford College

Detail

AAS and BAM combined to complete the installation of the slatted absorption panels within the atrium and stairs at this prestigious project .

The design was completed working with Bond Bryan architects to achieve both the aesthetic look and the reduction in the reverberation time.

Key Facts

Contractor BAM
Value £80,000
Architect David Lyons Associates
Product Continuously Slotted Panels

Gallery