Share

Doncaster Civic Centre

Detail

AAS worked in conjunction with Wates construction ltd and Cartwright Pickard architects to deliver a combination of absorption solution to this impressive £300 million civic centre development .

Products included continuously slotted painted panels around the stair and lift shafts . Oak veneered perforated panels around the double atrium balustrades on three floors and the fit out of the auditorium in curved oak panels

Key Facts

Contractor Wates
Value £450,000
Architect Cartwright Pickard
Product Continuously Slotted Panels and Perforated Acoustic Panels

Gallery