
Doncaster Civic Centre
AAS worked in conjunction with Wates construction ltd and Cartwright Pickard architects to deliver a combination of absorption solution to this impressive £300 million civic centre development .
Products included continuously slotted painted panels around the stair and lift shafts . Oak veneered perforated panels around the double atrium balustrades on three floors and the fit out of the auditorium in curved oak panels
Key Facts
Contractor | Wates |
---|---|
Value | £450,000 |
Architect | Cartwright Pickard |
Product | Continuously Slotted Panels and Perforated Acoustic Panels |