Share

Ripley Academy

Detail

AAS working for Kier construction central ltd designed supplied and installed 650m2 of beech veneered plywood absorption panels to the sports hall and fabric panels to the main hall.

The sports hall consisted of two sections of solid panels and a central zone of perforated boards to provide the absorbency required being class C in the sports hall . The lower section acting as rebound boards meant the panels had to be plywood due to the greater impact resistance .

The impact resistant fabric panels in the main hall had to achieve class A absorbency .

Key Facts

Architect Architype
Main Contractor Kier Construction Central ltd

Gallery