
St George’s School – Weybridge
We we’re contracted to design, supply and install the Oak Faced ply panels to the new sports hall .
The complex design included rebound panels at lower level , vents at mid level and perforated absorption panels at high level .
Integrating the staircase windows , climbing wall and seating within the design meant there were over 100 different panel designs .
This £330, 000 contract was completed for Blenheim House contractors and Scott Brownrigg architects .
Key Facts
Architect | Scott Brownrigg |
---|---|
Main Contractor | Blenheim House Contractors |
Estimated Project Value | £15 Million |
Product | Slotted Acoustic Panels, Perforated Acoustic Panels, Fabric Wall Panels |